Main Page

Info Page

Gallery Page

Multimedia Page

 
 

Click here to view the video.

In this video you might notice the "Check Oil" light is on. A new Dakota Digital gauge was installed and the oil sending unit had been disconnected. It was fixed soon thereafter. All welding, fabrication, paint, and assembly was done by Pete Clifton in a period of 3 months. Clearance after lowering was 5 inches.

 

 

Move on to the
Multimedia
 
or
Return to the
Articles
 

 

 

 




Copyright © 2007 4PlayCustomCycleDesign.com All Rights Reserved.
Web Design By: Ryan Ball